Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Classifieds
Media
New media
New comments
Search media
Log in
Register
What's New?
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Navigation
Install the app
Install
More Options
Advertise with us
Contact Us
Close Menu
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Forums
The Water Cooler
General Discussion
Navy Test-Fires 33-Megajoule Railgun
Search titles only
By:
Reply to Thread
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="JRSherman" data-source="post: 1392624" data-attributes="member: 13432"><p>If that ever happens, that's gonna be one sexy girl. It's been awhile since that I read that stuff in the Navy Times, but it seems like I remember that stuff was going to take a good period of time to start happening, i.e. 15-25 years. </p><p></p><p>Even with the Long Beach as a background study, the way our navy operates now is 200% different than then, so there will have to be theory tests, then design tests, operational tests, corrections to all those, etc etc etc that will happen before a core goes into the ship. Especially if they decide to deviate from a core design that they already use. I can't say what they will or won't use, but the core of a carrier is friggin huge, so I doubt that, and the core of a sub, either fast attack small or SSBN/GN medium probably won't fit the bill for where they want to take it. The SSBN displaces almost the same weight as the 14k ton cruiser, but probably won't do if they move to the 25k ton class.</p><p></p><p>On top of all of this, you have to remember it will be a contract effected project, so GE, Westinghouse, Northrop Grumman, etc will have their hands twisting it all around to get what they want out of it too.</p></blockquote><p></p>
[QUOTE="JRSherman, post: 1392624, member: 13432"] If that ever happens, that's gonna be one sexy girl. It's been awhile since that I read that stuff in the Navy Times, but it seems like I remember that stuff was going to take a good period of time to start happening, i.e. 15-25 years. Even with the Long Beach as a background study, the way our navy operates now is 200% different than then, so there will have to be theory tests, then design tests, operational tests, corrections to all those, etc etc etc that will happen before a core goes into the ship. Especially if they decide to deviate from a core design that they already use. I can't say what they will or won't use, but the core of a carrier is friggin huge, so I doubt that, and the core of a sub, either fast attack small or SSBN/GN medium probably won't fit the bill for where they want to take it. The SSBN displaces almost the same weight as the 14k ton cruiser, but probably won't do if they move to the 25k ton class. On top of all of this, you have to remember it will be a contract effected project, so GE, Westinghouse, Northrop Grumman, etc will have their hands twisting it all around to get what they want out of it too. [/QUOTE]
Insert Quotes…
Verification
Post Reply
Forums
The Water Cooler
General Discussion
Navy Test-Fires 33-Megajoule Railgun
Search titles only
By:
Top
Bottom