Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Classifieds
Media
New media
New comments
Search media
Log in
Register
What's New?
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Navigation
Install the app
Install
More Options
Advertise with us
Contact Us
Close Menu
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Forums
The Water Cooler
General Discussion
Need Dirt Work
Search titles only
By:
Reply to Thread
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="mouthpiece" data-source="post: 4282725" data-attributes="member: 1685"><p>Good luck, I called about 20 people before I found 6 that would give me a bid.</p><p>Of those , only 4 actually wanted to bid the job.</p><p>The guy I used out of these 4 wanted 1/2 up front and he quit less than 1/2 way through the job and screwed me for about 1/3 of the money.</p><p>2nd batch of bids of about 4 or 5 contractors, 1 guy got pissed off when I told him I was getting 4 bids , he said that was too many.</p><p>2 of the last 4 bids had almost identicle bids. </p><p>I used one guy and he didn't take a dime up front.</p><p>I'd probably only do around 1/4-1/3 paid upfront.</p></blockquote><p></p>
[QUOTE="mouthpiece, post: 4282725, member: 1685"] Good luck, I called about 20 people before I found 6 that would give me a bid. Of those , only 4 actually wanted to bid the job. The guy I used out of these 4 wanted 1/2 up front and he quit less than 1/2 way through the job and screwed me for about 1/3 of the money. 2nd batch of bids of about 4 or 5 contractors, 1 guy got pissed off when I told him I was getting 4 bids , he said that was too many. 2 of the last 4 bids had almost identicle bids. I used one guy and he didn't take a dime up front. I'd probably only do around 1/4-1/3 paid upfront. [/QUOTE]
Insert Quotes…
Verification
Post Reply
Forums
The Water Cooler
General Discussion
Need Dirt Work
Search titles only
By:
Top
Bottom