Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Classifieds
Media
New media
New comments
Search media
Log in
Register
What's New?
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Navigation
Install the app
Install
More Options
Advertise with us
Contact Us
Close Menu
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Forums
The Water Cooler
General Discussion
OSA Chit Chat Thread
Search titles only
By:
Reply to Thread
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="OkieJoe72" data-source="post: 4096728" data-attributes="member: 48447"><p>Good morning folks, hope everyone is staying hydrated. I’m in the long and slow process of moving homesteads. We decided to move shortly before Covid shut everything down, and material prices forced us to postpone. The price for materials have come down to a reasonable level so we are getting a little more done now. The electric meter was installed last week, and I’m working on setting up the main electric distribution panel along with some outdoor outlets for our RV and temp power for tools. Yesterday, I bought all the supplies and mounted the boxes. I set the cover for the main panel on the ground while mounting the box. When I went to pick it up, it was so hot that I could have fried an egg on it. If all goes well today, I’ll get everything wired together and have power going. If not, the hair that I have left on my head will probably be very curly. It’s 50/50.</p></blockquote><p></p>
[QUOTE="OkieJoe72, post: 4096728, member: 48447"] Good morning folks, hope everyone is staying hydrated. I’m in the long and slow process of moving homesteads. We decided to move shortly before Covid shut everything down, and material prices forced us to postpone. The price for materials have come down to a reasonable level so we are getting a little more done now. The electric meter was installed last week, and I’m working on setting up the main electric distribution panel along with some outdoor outlets for our RV and temp power for tools. Yesterday, I bought all the supplies and mounted the boxes. I set the cover for the main panel on the ground while mounting the box. When I went to pick it up, it was so hot that I could have fried an egg on it. If all goes well today, I’ll get everything wired together and have power going. If not, the hair that I have left on my head will probably be very curly. It’s 50/50. [/QUOTE]
Insert Quotes…
Verification
Post Reply
Forums
The Water Cooler
General Discussion
OSA Chit Chat Thread
Search titles only
By:
Top
Bottom