Feeling pretty confident it won’t be too hard once I got the wire ( 6/3 UF-B) and saw it passed fairly easy in some 1,25” PVC. I think I’ll be able to pull a length of conduit down the wire and then glue it together once in place. The 2 - 90’s will be at each end… again put in place over the wire before glueing. Just need some time to do it now. Weather and holidays not helping.
 
Joined
Jul 24, 2022
Messages
75
Reaction score
89
Normal max fill by code is 40%. Sounds like it’s pretty empty, but individual conductors at 40% is really full . More than one 90 bend and it’s a PITA. As a cable assembly the smaller wires are stacked side by side where your cable may be relatively round or flat, depending on the manufacturer. If in doubt and if you can you can run it through the 10’ sections and then glue them together. The UF jacket is the required cable protection and the PVC is just overkill.

If you have sized the cable correctly, I.e.distance vs load, overheating shouldn’t be a concern.
 

montesa

Sharpshooter
Special Hen
Joined
Feb 3, 2006
Messages
5,065
Reaction score
5,601
Location
OKC
I would be tempted to just bury the UF and dump an inch layer of dry concrete on top of it. I'm always doing the extra and im not sure it's ever made a difference.
 
Joined
Jul 24, 2022
Messages
75
Reaction score
89
Most areas that have rocky soil surround the cable with sand. Rocks, pressure, vibration and frost/ice movement are the main issues. Just your luck that armadillos love the taste of your thermo plastic.

If you sift your bedding and fill for rocks you should be OK. If you ever want to increase the size of your feeder, the PVC would be a nice thing. Just don’t stretch it tight to allow for expansion. Plastic grows and shrinks from temp. Like crazy. There’s a bulkhead by us with PVC feeds for the lighting. In the winter it’s straight and level. In the summer it sags like crazy. Good luck whatever you decide.
 
Joined
Mar 3, 2019
Messages
1,531
Reaction score
5,100
Location
OKC
Success !! The power is in and hot. So yesterday dug the hole and set the 500 gallon septic tank. Now ready to level then install the chambers for lateral.
 

Attachments

  • IMG_5275.jpeg
    IMG_5275.jpeg
    3.2 MB
  • IMG_5279.jpeg
    IMG_5279.jpeg
    3.7 MB
Joined
Mar 3, 2019
Messages
1,531
Reaction score
5,100
Location
OKC
May I suggest to cover the cavity system with fabric before covering with dirt.

Geotextile Fabric.
Thanks so much for the nudge to use the Geotextile. I had considered it but thought maybe it was an expense I could do without. Decided to take your advice. Installed and buried yesterday.

septic.jpg
 