Good morning folks, hope everyone is staying hydrated. I’m in the long and slow process of moving homesteads. We decided to move shortly before Covid shut everything down, and material prices forced us to postpone. The price for materials have come down to a reasonable level so we are getting a little more done now. The electric meter was installed last week, and I’m working on setting up the main electric distribution panel along with some outdoor outlets for our RV and temp power for tools. Yesterday, I bought all the supplies and mounted the boxes. I set the cover for the main panel on the ground while mounting the box. When I went to pick it up, it was so hot that I could have fried an egg on it. If all goes well today, I’ll get everything wired together and have power going. If not, the hair that I have left on my head will probably be very curly. It’s 50/50.
Be careful out there!!!