It’s been a busy couple of weeks.
Wheel chair bound son saved up enough money to install a man cave behind his home.
The building is built on a slope so a lot of fill dirt was required to get it level. Runoff from rain was causing an erosion issue.
Asked him if he had a contractor friend that would install some pavers we would buy.
He just had some tree work done by a guy that said he could do it.
So I measured and determined the number needed and picked up, then roughly spread out.
After contractor finished I got a pic of his job.
Nope, not happening. Come back and fix your fawk up. He did. The pics above are after the “fix”. You can only imagine what a sorry job it was the first time around.
So, I fired him and got a nephew to help do it right with string, tape measure and laser. It’s that simple.
When we got done. Less than 1/8” of deviation in 30’ of run.
Wheel chair bound son saved up enough money to install a man cave behind his home.
The building is built on a slope so a lot of fill dirt was required to get it level. Runoff from rain was causing an erosion issue.
Asked him if he had a contractor friend that would install some pavers we would buy.
He just had some tree work done by a guy that said he could do it.
So I measured and determined the number needed and picked up, then roughly spread out.
After contractor finished I got a pic of his job.
Nope, not happening. Come back and fix your fawk up. He did. The pics above are after the “fix”. You can only imagine what a sorry job it was the first time around.
So, I fired him and got a nephew to help do it right with string, tape measure and laser. It’s that simple.
When we got done. Less than 1/8” of deviation in 30’ of run.