I have 3 stripped lowers ready to go and am getting ready to form 1 them as SBR's. Once I receive my stamps do I have to build them to spec immediately or can they sit in the safe as stripped Engraved lowers waiting to be built over the next year or 2? With the wait times I would rather pony up the cash to register them all at once.