If you saw my other thread on Day Labor you know I have a plumbing problem.. What I discovered after the hole was dug out was a Slip Fix fitting that had blown apart. Not sure if it was put in to fix a previous leak of if for some reason it might be needed to compensate for ground movement. I can make the repair without using a slip fix fitting, what I'm wondering about is it normal to install a slip fitting after the water meter?
To better describe what I have.. Out of the meter is 3/4 PVC which makes a 90 (actually two 45's) then adapts to 1 inch. The slip fitting was in the 1 inch about 8 inches from the 3/4 to 1 inch adaptor fitting. I can run 1 inch with a normal 90 then adapt it to 3/4 to go to the meter. Have about two feet on the 1 inch leg to the 90 then about 1 1/2 feet on the 3/4 to the meter.
Any advice from those that know?
Thanks
To better describe what I have.. Out of the meter is 3/4 PVC which makes a 90 (actually two 45's) then adapts to 1 inch. The slip fitting was in the 1 inch about 8 inches from the 3/4 to 1 inch adaptor fitting. I can run 1 inch with a normal 90 then adapt it to 3/4 to go to the meter. Have about two feet on the 1 inch leg to the 90 then about 1 1/2 feet on the 3/4 to the meter.
Any advice from those that know?
Thanks